BUSITEMA UNIVERSITY | LIBRARY
Log in
 
Repository logo
Repository logo
  • Submit an Item
  • Browse
  • English
  • Català
  • Čeština
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • Italiano
  • Latviešu
  • Magyar
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Suomi
  • Svenska
  • Türkçe
  • Tiếng Việt
  • Қазақ
  • বাংলা
  • हिंदी
  • Ελληνικά
  • Yкраї́нська
  • Log In
    New user? Click here to register.Have you forgotten your password?
  1. Home
  2. Browse by Author

Browsing by Author "Masengere Isaac, Grace"

Now showing 1 - 1 of 1
Results Per Page
Sort Options
  • No Thumbnail Available
    Item
    Design and Construction of a Water Softening System
    (2026) Masengere Isaac, Grace
    Access to clean, safe, and readily available drinking water is a fundamental pillar of public health and sustainable development worldwide. The borehole supplying Login Hostel in Syaule, Busia District, has severely hard water (320 mg/L as CaCO3), causing health and operational problems for students. To solve this, we designed and built a solar-powered electrocoagulation water softening system. The system meets a maximum daily demand of 3.9 m3/d for 30 residents. Electrocoagulation was chosen because it scored highest (126 points) in a technology analysis, and aluminum was selected for both electrodes with a score of 135 points. The design features a 7-ring helical coil creating 6 electrochemical cells inside a 3.5-inch polyvinyl chloride casing. It includes a three-stage downstream filter: a polypropylene sediment filter, a granular activated carbon buffer, and a compressed carbon block. Power comes from a 12.8 V, 120 Ah LiFePO4 battery, charged by a 300 W to 350 W monocrystalline solar panel and regulated by a 30 A Maximum Power Point Tracking charge controller. Testing at 9 V, 12 V, and 24 V proved that 12 V works best. At 12 V, the system removed 62% of the water hardness while using only 0.81 kWh/m3 of electricity. After 60 minutes of continuous flow, the final hardness dropped to a safe 125.3 mg/L. A 24-hour test showed the battery stayed safely above a 50% charge level throughout operation. Financially, the system costs 1,200,000 Ugandan Shillings to build. Over five years, it produces a Net Present Value of 11,330,586 Ugandan Shillings, a payback period of 5.4 months, and a profitability index of 7.30.
Contact us for questions and to provide feedback.

Repository logo

  • Cookie settings
  • Privacy policy
  • End User Agreement
  • Send Feedback