Odyek, John2026-06-232026-06-232017-11-08Odyek, J. (2017). Designs for crude oil pipe ready by December. New Visionhttps://bdears.busitema.ac.ug/handle/123456789/6438Newspaper articleThe engineering designs for the crude oil pipe line between Hoima district and Tanga Port in Tanzania are expected to be completed by the end of this month.enDesigns for crude oil pipe ready by December.Article